Difference between revisions of "Sep 20, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Tentative Agenda)
Line 11: Line 11:
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 
# mini-Bcal (Elton)
 
# mini-Bcal (Elton)
 +
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2053 GlueX-doc-2053] Tests of the pre-production readout assemblies with the mini-Bcal
 
# SiPM production testing (Yi)
 
# SiPM production testing (Yi)
 
# Mechanical assembly (Jim)
 
# Mechanical assembly (Jim)

Revision as of 08:02, 20 September 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
  3. Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
    • GlueX-doc-2053 Tests of the pre-production readout assemblies with the mini-Bcal
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: