Line 11: | Line 11: | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
# mini-Bcal (Elton) | # mini-Bcal (Elton) | ||
+ | #* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2053 GlueX-doc-2053] Tests of the pre-production readout assemblies with the mini-Bcal | ||
# SiPM production testing (Yi) | # SiPM production testing (Yi) | ||
# Mechanical assembly (Jim) | # Mechanical assembly (Jim) |
Revision as of 08:02, 20 September 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
- Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- GlueX-doc-2053 Tests of the pre-production readout assemblies with the mini-Bcal
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: