Difference between revisions of "Sep 20, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(Created page with "== Action Items from previous meetings == # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elto...") |
(→Action Items from previous meetings) |
||
Line 3: | Line 3: | ||
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | # Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | ||
+ | # Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 16:48, 13 September 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
- Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: