Difference between revisions of "Minutes-8-30-2012"
From GlueXWiki
Line 2: | Line 2: | ||
= Agenda = | = Agenda = | ||
− | # | + | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_August_30_2012.xlsx Construction Tracking] (Dave) |
# Cathode corrosion | # Cathode corrosion | ||
#* Recent test results: [http://www.jlab.org/Hall-D/detector/fdc/corrosion/2012-08-30_09.26.58.jpg] | #* Recent test results: [http://www.jlab.org/Hall-D/detector/fdc/corrosion/2012-08-30_09.26.58.jpg] | ||
Line 22: | Line 22: | ||
== Production == | == Production == | ||
− | - Dave: | + | - Dave for: working on all the cathodes for package #1. Using the new tool to hold the cathodes flat, two cathodes moved to tables and the cards are being glued there. Will have cathodes for the first, second, and third cells by next Tuesday, next Thursday, and next next Tuesday respectively. This is assuming one cathode per day, which is limited by the tools that we use now. |
− | - | + | - Wire frames: Chris will put the resistors on the first PCB set next week. Then we will start laminating the wire plane #29, we have a frame for it. The other three G10 wire frames will come from the machine shop in ~2 weeks. Fernando and Bill confirmed that the new PCBs can be used. |
+ | |||
+ | - Quotations came from Allflex | ||
== Cathode corrosion == | == Cathode corrosion == |
Revision as of 17:56, 30 August 2012
August 30, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Cathode corrosion
- Recent test results: [1]
- Conductive tape studies: [2], [3], [4],[5], [6] (Vlad)
- Engineering (Bill)
- Cathode strong-backs
- Electronics (Chris, Nick)
- PCBs
- Third package tests FDC E-log (Beni)
- TDR, pages 132-145 (Lubomir)
- Other