Difference between revisions of "BLTWG Meeting 07/23/2012"
From GlueXWiki
(→Agenda) |
|||
Line 8: | Line 8: | ||
# Progress on UConn construction contract -- ''Richard'' | # Progress on UConn construction contract -- ''Richard'' | ||
# Requirements for low current operation -- ''discussion'' | # Requirements for low current operation -- ''discussion'' | ||
+ | # [http://argus.phys.uregina.ca/gluex/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan'' | ||
# The fixed tagger array geometry -- ''Dan'' | # The fixed tagger array geometry -- ''Dan'' | ||
# Report from Glasgow group -- ''Ken'' | # Report from Glasgow group -- ''Ken'' | ||
Line 16: | Line 17: | ||
#* possible loan of DAq system with FADC to UConn | #* possible loan of DAq system with FADC to UConn | ||
#* possible swap of two SIPM's with Jlab (soon??) | #* possible swap of two SIPM's with Jlab (soon??) | ||
− | + | ||
+ | |||
===Notes=== | ===Notes=== | ||
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/microscopeLayout-7-2012.pdf different views of the microscope box, current design] -- ''James'' | #* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/microscopeLayout-7-2012.pdf different views of the microscope box, current design] -- ''James'' |
Revision as of 11:19, 23 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 561 3418)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- Requirements for low current operation -- discussion
- Beginnings of a plan for mapping the tagger magnet -- Dan
- The fixed tagger array geometry -- Dan
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on diamond thinning from SINMAT -- Richard
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)