Difference between revisions of "Minutes-7-12-2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
 
#* Third package preparation
 
#* Third package preparation
 
# Engineering update (Bill)
 
# Engineering update (Bill)
#* Cooling system
+
#* Cooling system [http://www.jlab.org/Hall-D/detector/fdc/drawings/Cooling1.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/Cooling2.png]
 
# Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
 
# Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
 
# Gas system update (Beni)
 
# Gas system update (Beni)

Revision as of 12:11, 12 July 2012

July 12, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Fourth package tests
    • Spare wire frames
    • Third package preparation
  2. Engineering update (Bill)
  3. Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
  4. Gas system update (Beni)
  5. Test set-up in 126 (Beni)
  6. Other