Difference between revisions of "GlueX Start Counter Meeting, May 17, 2012"
(→Agenda) |
|||
Line 26: | Line 26: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | start counter meeting minutes | ||
+ | |||
+ | puneet, werner | ||
+ | beni, fernando, tim, mark, chuck, yi | ||
+ | |||
+ | simluation | ||
+ | |||
+ | background rates w/ updated geometry | ||
+ | |||
+ | chuck shows design | ||
+ | |||
+ | termal mat in back pocket if needed | ||
+ | |||
+ | spacer in between boards for light tight | ||
+ | |||
+ | bolt holes serve as positioners | ||
+ | scintillators need to be set precisely | ||
+ | use postioning template when scint attached to foam | ||
+ | |||
+ | tolerance less than 1 mm | ||
+ | there will be air gap | ||
+ | |||
+ | problem with interference of cable connector | ||
+ | |||
+ | rigid flex cable possible | ||
+ | |||
+ | nick sandoval is the tecnician working on thes | ||
+ | |||
+ | plan to send out tomorrow | ||
+ | in fab by next week | ||
+ | |||
+ | got schint from McNeal | ||
+ | one destroyed | ||
+ | other not bad | ||
+ | werner working on tdr | ||
+ | |||
+ | • put yi on start counter meeting attendees |
Revision as of 10:00, 31 May 2012
GlueX Start Counter Meeting
Thursday, May 17, 2012
10 am EDT
JLab: ARC 428
Agenda
- Announcements
- Review minutes from previous meeting
- Prototype Report
- Readout Design
- Simulation
- presentation from previous collaboration meeting [1]
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eneueMvsv2aBaDInalIn
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
Minutes
start counter meeting minutes
puneet, werner beni, fernando, tim, mark, chuck, yi
simluation
background rates w/ updated geometry
chuck shows design
termal mat in back pocket if needed
spacer in between boards for light tight
bolt holes serve as positioners scintillators need to be set precisely use postioning template when scint attached to foam
tolerance less than 1 mm there will be air gap
problem with interference of cable connector
rigid flex cable possible
nick sandoval is the tecnician working on thes
plan to send out tomorrow in fab by next week
got schint from McNeal one destroyed other not bad werner working on tdr
• put yi on start counter meeting attendees