Difference between revisions of "GlueX Start Counter Meeting, May 3, 2012"
(Created page with "GlueX Start Counter Meeting<br> Thursday, May 3, 2012<br> 10 am EDT<br> JLab: CEBAF Center, Room 326/327<br> =Agenda= # Announcements # Review [[GlueX Start Counter Meeting, Ap...") |
(notes as minutes) |
||
Line 25: | Line 25: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | werner, buneet | ||
+ | beni, tim,mark, elton | ||
+ | |||
+ | • McNeal, sample still has not come in | ||
+ | • build, in finishing | ||
+ | |||
+ | sipm board | ||
+ | • 3 sectors ok | ||
+ | • 3 bias voltages | ||
+ | • outrigger board | ||
+ | • thermister, not used | ||
+ | ∘ elton and werner prefer it | ||
+ | ∘ does set point temp need to be known in advance? | ||
+ | |||
+ | new geometry for stat counters ready | ||
+ | • remove long light guides | ||
+ | • puneet will do it | ||
+ | • may have to add some material for sipm boards | ||
+ | |||
+ | LED system | ||
+ | • usefull to vary intesnsity, check efficiency, if fsast, can look at timing resolution | ||
+ | |||
+ | Mechanical | ||
+ | |||
+ | • inner support to be machined out of one piece | ||
+ | • no foam on the outside | ||
+ | • light-tighting an issue |
Revision as of 12:55, 3 May 2012
GlueX Start Counter Meeting
Thursday, May 3, 2012
10 am EDT
JLab: CEBAF Center, Room 326/327
Agenda
- Announcements
- Review minutes from previous meeting
- Prototype Report
- Readout Design
- Contract Status
- Simulation
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eneueMvsv2aBaDInalIn
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
Minutes
werner, buneet beni, tim,mark, elton
• McNeal, sample still has not come in • build, in finishing
sipm board • 3 sectors ok • 3 bias voltages • outrigger board • thermister, not used ∘ elton and werner prefer it ∘ does set point temp need to be known in advance?
new geometry for stat counters ready • remove long light guides • puneet will do it • may have to add some material for sipm boards
LED system • usefull to vary intesnsity, check efficiency, if fsast, can look at timing resolution
Mechanical
• inner support to be machined out of one piece • no foam on the outside • light-tighting an issue