Difference between revisions of "Minutes-4-19-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "April 19, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_12_2012.xlsx Construction Tracking] (Dave) #* Prod...")
 
Line 2: Line 2:
  
 
= Agenda =
 
= Agenda =
 
+
# New results from the [http://www.jlab.org/Hall-D/detector/fdc/documents/oxygen.pdf oxygen studies] (Lubomir)
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_12_2012.xlsx Construction Tracking] (Dave)
+
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_19_2012.xlsx Construction Tracking] (Dave)
 +
#* New procedures for package refurbishment
 +
#* First production cell with Apiezon and Viton O-rings
 
#* Production status
 
#* Production status
# Results from the [http://www.jlab.org/Hall-D/detector/fdc/documents/oxygen.pdf oxygen studies] (Lubomir)
 
#* First production cell with Viton O-rings
 
#* New tests with EPDM
 
 
# Engineering update (Bill)  
 
# Engineering update (Bill)  
#* Frame deformations with new O-rings [http://www.jlab.org/Hall-D/detector/fdc/ansys_analyses/OringDeform1.png Ansys results],[http://www.jlab.org/Hall-D/detector/fdc/ansys_analyses/OringDeform2.png Ansys results]
 
 
# Electronics update (Chris)
 
# Electronics update (Chris)
 +
# Tests with first package at 126 (Beni)
 +
#* Grounding
 
# Other
 
# Other
  

Revision as of 17:56, 18 April 2012

April 19, 2012 FDC meeting

Agenda

  1. New results from the oxygen studies (Lubomir)
  2. Production Construction Tracking (Dave)
    • New procedures for package refurbishment
    • First production cell with Apiezon and Viton O-rings
    • Production status
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Tests with first package at 126 (Beni)
    • Grounding
  6. Other