(Created page with "February 23, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_23_2012.xlsx Construction Tracking] (Dave) #...")
 
(Agenda)
Line 6: Line 6:
 
#* Production status
 
#* Production status
 
#* Testing at Blue Crab (Lubomir)
 
#* Testing at Blue Crab (Lubomir)
# First package testing [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Lubomir)
+
# First package tests [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Lubomir)
 
# Engineering update[http://www.jlab.org/Hall-D/detector/fdc/drawings/NEW_MANIFOLD_ASSY2.png],[http://www.jlab.org/Hall-D/detector/fdc/drawings/NEW_MANIFOLD_ASSY1.png cooling manifold] (Bill)  
 
# Engineering update[http://www.jlab.org/Hall-D/detector/fdc/drawings/NEW_MANIFOLD_ASSY2.png],[http://www.jlab.org/Hall-D/detector/fdc/drawings/NEW_MANIFOLD_ASSY1.png cooling manifold] (Bill)  
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 18:58, 22 February 2012

February 23, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production status
    • Testing at Blue Crab (Lubomir)
  2. First package tests FDC ELOG (Beni, Lubomir)
  3. Engineering update[1],cooling manifold (Bill)
  4. Electronics update (Chris)
  5. Other