− | ''Attending: | + | ''Attending: Jack,, Carl, Scot, Chris, Yi, John, Elton, Jim, Eugene |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # SiPM production testing (everyone) | ||
+ | # Mechanical assembly (Scot) | ||
+ | # Mechanical (Jim) | ||
+ | # Mechanical drawings (Chuck) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Preamp-summing (Fernando/Chris) | ||
+ | # SiPM testing (Ivan) |
Revision as of 12:15, 10 February 2012
Action Items from previous meetings
- Populate interface cards to the ADC (Chris)
- Complete 3 remaining boards for SiPM testing (Chris)
- Determine if swapped bias pins was accidental or in design (Chris)
- Make a second SiPM extraction tool for USM (Jim and Scot)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: Jack,, Carl, Scot, Chris, Yi, John, Elton, Jim, Eugene
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)