Difference between revisions of "Feb 9, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(Created page with "== Action Items from previous meetings == # Populate interface cards to the ADC (Chris) # Complete 3 remaining boards for SiPM testing (Chris) # Determine if swapped bias pins w...") |
(→Action Items from previous meetings) |
||
Line 6: | Line 6: | ||
# Modify design so that the samtek/ADC transition board the locking mechanism works (Chris) | # Modify design so that the samtek/ADC transition board the locking mechanism works (Chris) | ||
# Provide cost information to Chris regarding the thermistor (Jack) | # Provide cost information to Chris regarding the thermistor (Jack) | ||
− | # | + | # Make a second SiPM extraction tool for USM (Jim and Scot) |
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 18:46, 2 February 2012
Action Items from previous meetings
- Populate interface cards to the ADC (Chris)
- Complete 3 remaining boards for SiPM testing (Chris)
- Determine if swapped bias pins was accidental or in design (Chris)
- Modify design so that the samtek/ADC transition board the locking mechanism works (Chris)
- Provide cost information to Chris regarding the thermistor (Jack)
- Make a second SiPM extraction tool for USM (Jim and Scot)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: