# Summary of current work on tracking. | # Summary of current work on tracking. | ||
− | == Minutes == | + | == Hardware Minutes == |
+ | Participants: Curtis, Naomi, Dave, Mark, Eugene, Tim, Simon, Beni, Lubomir | ||
+ | |||
+ | === FDC Update === | ||
+ | |||
+ | === CDC Update === | ||
+ | # Stringing - this should be finished next week, there were 220 wires left to do this morning | ||
+ | # HV - 500V is being applied to (one end of) each wire and the (very small) current measured | ||
+ | # Resistance - now is a good opportunity to measure the resistance of each wire | ||
+ | # Survey - wires need to settle for a week before finishing tension measurements. Tim will schedule the survey team between Feb 20 and March 5. | ||
+ | # Remaining hardware - the cheeseplate is on its way to CMU. Slava is working on the other hardware. | ||
+ | # Soldering - the techs are now expert at this and will take a break from practice. | ||
+ | |||
+ | == Software Minutes == |
Revision as of 12:31, 1 February 2012
Contents
Meeting Time and Place
Wednesday February 1, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone, dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Hardware Agenda
- Announcements
- FDC Update logbook
- CDC Update
- February 2012 GlueX-doc 1898
Tracking Software Agenda
- Announcements.
- Status of performance metrics.
- Summary of current work on tracking.
Hardware Minutes
Participants: Curtis, Naomi, Dave, Mark, Eugene, Tim, Simon, Beni, Lubomir
FDC Update
CDC Update
- Stringing - this should be finished next week, there were 220 wires left to do this morning
- HV - 500V is being applied to (one end of) each wire and the (very small) current measured
- Resistance - now is a good opportunity to measure the resistance of each wire
- Survey - wires need to settle for a week before finishing tension measurements. Tim will schedule the survey team between Feb 20 and March 5.
- Remaining hardware - the cheeseplate is on its way to CMU. Slava is working on the other hardware.
- Soldering - the techs are now expert at this and will take a break from practice.