Difference between revisions of "Sep 27, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
Line 37: Line 37:
  
 
=Minutes=
 
=Minutes=
''Attending:
+
''Attending: Yi, Beni, Tim, Elton, Dave (Jlab); Zisis, Andrei (UofR); Matt, Kei (IU)
 +
 
 +
# Announcements
 +
# Review of Action Items
 +
# Monitoring.  Christina cannot participate, but she sent this note;
 +
#* I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
 +
#* I will also send you few slides over the weekend to prsent in the coll.meeting.
 +
# FCAL
 +
## Construction Status: mechanical, bases (notes from Matt)
 +
# BCAL
 +
## Construction Status: builds
 +
# Simulations/Reconstruction
 +
# Timing measurements of SiPMs [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1814 GlueX-doc-1814] (Elton)
 +
# Beam tests in Hall B (fall 2011) (Kei)
 +
## Contact with Hall B (Elton)
 +
##* After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
 +
# Discussions of presentations at [[GlueX-Collaboration-Sep-2011]]
 +
# Any other business

Revision as of 14:26, 27 September 2011

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
  2. Beam test

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring. Christina cannot participate, but she sent this note;
    • I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
    • I will also send you few slides over the weekend to prsent in the coll.meeting.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  5. BCAL
    1. Construction Status: builds
  6. Simulations/Reconstruction
  7. Timing measurements of SiPMs GlueX-doc-1814 (Elton)
  8. Beam tests in Hall B (fall 2011) (Kei)
    1. Contact with Hall B (Elton)
      • After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
  9. Discussions of presentations at GlueX-Collaboration-Sep-2011
  10. Any other business

Minutes

Attending: Yi, Beni, Tim, Elton, Dave (Jlab); Zisis, Andrei (UofR); Matt, Kei (IU)

  1. Announcements
  2. Review of Action Items
  3. Monitoring. Christina cannot participate, but she sent this note;
    • I can report that the new LED's have arrived, Kappos will mount them this week and hopefully we will test them next week.
    • I will also send you few slides over the weekend to prsent in the coll.meeting.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  5. BCAL
    1. Construction Status: builds
  6. Simulations/Reconstruction
  7. Timing measurements of SiPMs GlueX-doc-1814 (Elton)
  8. Beam tests in Hall B (fall 2011) (Kei)
    1. Contact with Hall B (Elton)
      • After talking to Stepan, he got an estimate from Doug to remove the blower and pipes (1/2 day). It is a good filler job and he will pass this on to Dave so that it gets added to the Hall B task list.
  9. Discussions of presentations at GlueX-Collaboration-Sep-2011
  10. Any other business