Difference between revisions of "Sep 8, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
|||
Line 2: | Line 2: | ||
# Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando). | # Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando). | ||
+ | # Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl) | ||
# Bias/temperature compensation review: Tentatively set for Sep 29. | # Bias/temperature compensation review: Tentatively set for Sep 29. | ||
Revision as of 16:55, 1 September 2011
Action Items from previous meetings
- Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
- Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
- Bias/temperature compensation review: Tentatively set for Sep 29.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)
Minutes
Attending: