Difference between revisions of "Minutes-9-1-2011"
From GlueXWiki
Line 17: | Line 17: | ||
= Minutes = | = Minutes = | ||
− | Participants: | + | Participants: Bill, Eugene, Dave, Chris, Simon, Beni, Glenn, and Lubomir. |
== Production == | == Production == | ||
− | - Dave: | + | - Dave: wire frame #5 is ready and now working on #6: it was strung yesterday by Casey and Al in 3-4 hours (record). Then the wires were taped and now doing position measurements. |
- HV cap problem (see pictures linked above). Everybody was surprised by the size and the abundance of the solder balls: 1-2mm (compared to the gap of 4.5mm between the pads) under more than 50% of the caps. Based on this observation, a decision was made on Monday to re-solder all the capacitors on the newly built wire planes. The above statistics applies for the two wire frames that were re-soldered by Anatoly so far. The leakage current after re-soldering went down to several nA for the whole frame. Not all the boards are like these: when we started testing the capacitors a month ago, Anatoly re-soldered the capacitors on another board, but we didn't see such solder balls there. | - HV cap problem (see pictures linked above). Everybody was surprised by the size and the abundance of the solder balls: 1-2mm (compared to the gap of 4.5mm between the pads) under more than 50% of the caps. Based on this observation, a decision was made on Monday to re-solder all the capacitors on the newly built wire planes. The above statistics applies for the two wire frames that were re-soldered by Anatoly so far. The leakage current after re-soldering went down to several nA for the whole frame. Not all the boards are like these: when we started testing the capacitors a month ago, Anatoly re-soldered the capacitors on another board, but we didn't see such solder balls there. |
Revision as of 15:44, 1 September 2011
September 1, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Status
- Package configurations
- First package tests (Lubomir)
- Engineering update (Bill)
- First package flatness measurements
- Electronics update (Chris)
- Chamber testing at EEL126 (cell#2) (Beni, Lubomir)
- Other