Difference between revisions of "Minutes-7-21-2011"
From GlueXWiki
Line 5: | Line 5: | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave) | ||
#* Status | #* Status | ||
− | #* | + | #* HV tests: results, testing procedures (Lubomir) |
− | + | #* Other: wire deadening, iron source | |
− | #* | + | # Engineering update (Bill) |
− | # | + | # Electronics update (Chris) |
− | # Electronics (Chris) | + | |
− | + | ||
− | + | ||
# Chamber testing at EEL126 | # Chamber testing at EEL126 | ||
− | |||
#* Tests with external tracking (Beni) | #* Tests with external tracking (Beni) | ||
− | # Other | + | # Other |
<!-- | <!-- |
Revision as of 12:26, 21 July 2011
July 14, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Status
- HV tests: results, testing procedures (Lubomir)
- Other: wire deadening, iron source
- Engineering update (Bill)
- Electronics update (Chris)
- Chamber testing at EEL126
- Tests with external tracking (Beni)
- Other