Difference between revisions of "Minutes-7-14-2011"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* Status
 
#* Status
 
#* Wire deadening
 
#* Wire deadening
#* HV tests
 
 
# Engineering (Bill)
 
# Engineering (Bill)
 
#* Flatness problem: package strongback, gusset rings
 
#* Flatness problem: package strongback, gusset rings
 
#* Stringing table modifications  
 
#* Stringing table modifications  
# Electronics update (Chris)
+
# Electronics (Chris)
 +
#* HV tests
 +
#* Other
 
# Chamber testing at EEL126
 
# Chamber testing at EEL126
 
#* First cell tests with fADC (Lubomir)
 
#* First cell tests with fADC (Lubomir)

Revision as of 15:09, 13 July 2011

July 14, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
  2. Engineering (Bill)
    • Flatness problem: package strongback, gusset rings
    • Stringing table modifications
  3. Electronics (Chris)
    • HV tests
    • Other
  4. Chamber testing at EEL126
    • First cell tests with fADC (Lubomir)
    • Tests with external tracking (Beni)
  5. Other: naming convention