Difference between revisions of "Coil Test Weekly Meeting 10-Jun-2011"
From GlueXWiki
m |
m |
||
Line 18: | Line 18: | ||
** Danfysik fault sequencer and slow dump | ** Danfysik fault sequencer and slow dump | ||
** additional PLC and HMI programming | ** additional PLC and HMI programming | ||
+ | *** network loss problem? | ||
** fast DAQ | ** fast DAQ | ||
+ | ** replace smaller UPS | ||
** anything else? | ** anything else? | ||
* Documentation | * Documentation | ||
Line 30: | Line 32: | ||
* Preparing for moving into the hall | * Preparing for moving into the hall | ||
** order all controls equipment so P6 line can be closed | ** order all controls equipment so P6 line can be closed | ||
+ | * [http://halldweb1.jlab.org/mantisbt Mantis Task Tracker] |
Revision as of 17:02, 7 June 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 10-Jun-2011 9:30 am ARC 231
Agenda
- Lessons learned from Coil 3
- do we need to add or change anything?
- Coil 2 status
- installation status
- hi-pot results
- cooldown timeline
- subcoil inductances and quench detector
- Danfysik fault sequencer and slow dump
- additional PLC and HMI programming
- network loss problem?
- fast DAQ
- replace smaller UPS
- anything else?
- Documentation
- trip chains
- anything else?
- Will there be any auxiliary tests?
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- IRMIS at JLab
- filled with BNL "training" data
- Preparing for moving into the hall
- order all controls equipment so P6 line can be closed
- Mantis Task Tracker