Line 12: | Line 12: | ||
** do we need to add or change anything? | ** do we need to add or change anything? | ||
* Coil 2 status | * Coil 2 status | ||
− | ** installation | + | ** installation status |
− | ** | + | ** hi-pot results |
+ | ** cooldown timeline | ||
+ | ** subcoil inductances and quench detector | ||
** Danfysik fault sequencer and slow dump | ** Danfysik fault sequencer and slow dump | ||
** additional PLC and HMI programming | ** additional PLC and HMI programming |
Revision as of 16:56, 7 June 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 10-Jun-2011 9:30 am ARC 231
Agenda
- Lessons learned from Coil 3
- do we need to add or change anything?
- Coil 2 status
- installation status
- hi-pot results
- cooldown timeline
- subcoil inductances and quench detector
- Danfysik fault sequencer and slow dump
- additional PLC and HMI programming
- fast DAQ
- anything else?
- Documentation
- trip chains
- anything else?
- Will there be any auxiliary tests?
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- IRMIS at JLab
- filled with BNL "training" data
- Preparing for moving into the hall
- order all controls equipment so P6 line can be closed