Difference between revisions of "OWG Meeting 25-May-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 40: Line 40:
  
 
1:30 PM Wed 8-Jun-2011 CC F326
 
1:30 PM Wed 8-Jun-2011 CC F326
 +
 +
 +
 +
==Minutes==
 +
 +
Present:  Elliott W, Simon T, Bryan M, Graham H, Dave L, Hovanes E, Beni Z, Dave A.
 +
 +
 +
 +
'''Coil Test'''
 +
 +
Elliott reported on the status of the recent coil test.
 +
 +
* Ramped to 1500 A the previous Mon.
 +
* No problems with cryo, magnet, power supply, control system.
 +
* Short to ground requried addendum to OSP, caused a few days delay.  Can run with max one short to ground.
 +
* A few problems with safety system.
 +
** some strain gauges broken or improperly wired.
 +
** needed another OSP revision to allow operation with no strain gauges on radial Heim columns.
 +
** used field asymmetry measurments to indirectly determine stresses on radial Heim columns.
 +
* Coil 2 put back together, found one leak that will be repaired.

Revision as of 16:21, 26 May 2011

Agenda

  • Announcements
  • Review of minutes from 27-Apr-2011 meeting
  • Coil test update - Elliott, Yi, Beni, Ivan
    • short to ground, ground fault detector
    • strain gauges
    • VME fast DAQ system
    • SiPM tests
    • VME/VXS and HV/LV crate tests
  • IT review - Mark, Dave
  • Remote Access review - Graham
  • IRMIS - Elliott
  • Event size and raw event format - Dave, Carl
  • Event display - Elliott, Andrew
  • Java coda object framework - Elliott, Andrew
  • Other hardware tests - Chris, Beni
    • Multi-crate trigger test
    • FDC cosmic ray test
  • DAQ Group code distribution, build system, include dirs - Carl
  • Controls test stand - Hovanes, Elliott
  • Update on conditions database - Mark
  • Electronics, trigger and DAQ status reports - Chris, Alex, Dave, Fernando, Ben, Ed, William, Bryan
  • Mantis Task Tracker


Time/Location

1:30 PM Wed 25-May-2011 CC F326


Announcements

Next Meeting

1:30 PM Wed 8-Jun-2011 CC F326


Minutes

Present: Elliott W, Simon T, Bryan M, Graham H, Dave L, Hovanes E, Beni Z, Dave A.


Coil Test

Elliott reported on the status of the recent coil test.

  • Ramped to 1500 A the previous Mon.
  • No problems with cryo, magnet, power supply, control system.
  • Short to ground requried addendum to OSP, caused a few days delay. Can run with max one short to ground.
  • A few problems with safety system.
    • some strain gauges broken or improperly wired.
    • needed another OSP revision to allow operation with no strain gauges on radial Heim columns.
    • used field asymmetry measurments to indirectly determine stresses on radial Heim columns.
  • Coil 2 put back together, found one leak that will be repaired.