Difference between revisions of "Coil Test Weekly Meeting 15-Apr-2011"
From GlueXWiki
m |
|||
Line 9: | Line 9: | ||
'''Agenda''' | '''Agenda''' | ||
− | * Coil 3 installation status | + | * Coil 3 installation status and cooldown schedule |
− | * | + | * Status of fixes/improvements |
** Danfysik power transistor | ** Danfysik power transistor | ||
** quench detector | ** quench detector | ||
** document trip chains | ** document trip chains | ||
− | |||
** slow dump | ** slow dump | ||
** new wiring | ** new wiring | ||
− | * PLC | + | * PLC coding status |
− | + | * VME-based fast DAQ system | |
− | * | + | ** connection to I/O module, voltage division, overvoltage protection |
− | ** | + | ** readout software status |
− | ** software status | + | * Testing in B field: VME/VXS crates, HV/LV crates, SiPM's |
− | * | + | |
− | + | ||
− | + | ||
− | + | ||
* [[For_the_third_coil|To-do list]] for the next coil | * [[For_the_third_coil|To-do list]] for the next coil | ||
** measure UPS lifetime under operating conditions | ** measure UPS lifetime under operating conditions |
Latest revision as of 15:52, 13 April 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 15-Apr-2011 9:30 am ARC 231
Agenda
- Coil 3 installation status and cooldown schedule
- Status of fixes/improvements
- Danfysik power transistor
- quench detector
- document trip chains
- slow dump
- new wiring
- PLC coding status
- VME-based fast DAQ system
- connection to I/O module, voltage division, overvoltage protection
- readout software status
- Testing in B field: VME/VXS crates, HV/LV crates, SiPM's
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- IRMIS
- Preparing for moving into the hall