Difference between revisions of "Minutes-4-7-2011"
From GlueXWiki
(→Production) |
|||
Line 4: | Line 4: | ||
# Production | # Production | ||
− | #* Readiness review: | + | #* Readiness review: [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Final%20Talks/Hall-D_Readiness_Review_Report.pdf Final Readiness Review Report] |
#* Production status (Dave) | #* Production status (Dave) | ||
# Electronics | # Electronics | ||
Line 24: | Line 24: | ||
- Just before the meeting the review committee send us their final report, linked above to the agenda. | - Just before the meeting the review committee send us their final report, linked above to the agenda. | ||
− | + | ||
<!-- | <!-- |
Revision as of 16:21, 7 April 2011
April 7, 2011 FDC meeting
Agenda
- Production
- Readiness review: Final Readiness Review Report
- Production status (Dave)
- Electronics
- Status (Fernando,Chris)
- Cathode foil inspection
- Engineering
- Tests with conductive tape (Lubomir, Bill)
- Status (Bill)
- Chamber testing
- Electronics calibration FDC Log Book, page 554-556 (Simon)
- Other
Minutes
Participants: Bill, Dave, Chris, Simon, Beni, Eugene, and Lubomir.
Production
- Just before the meeting the review committee send us their final report, linked above to the agenda.