Difference between revisions of "2011-01-26"
From GlueXWiki
(→Agenda) |
|||
Line 31: | Line 31: | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
** Trigger/DAQ/Monitoring/Controls ([[OWG Meeting 24-Nov-2010 | 24-Nov-2010]]) | ** Trigger/DAQ/Monitoring/Controls ([[OWG Meeting 24-Nov-2010 | 24-Nov-2010]]) | ||
− | ** Tracking ([[ | + | ** Tracking ([[January 19, 2011 Tracking CDC/FDC | Minutes from January 19]]) |
− | ** Calorimetry ([[Jan | + | ** Calorimetry ([[Jan 20, 2010 Calorimetry|Jan 20, 2011 Calorimetry]]); Readout ([[Jan 13, 2011 Readout|Minutes from January 13]]) |
− | ** TOF ([[GlueX TOF Meeting, | + | ** TOF ([[GlueX TOF Meeting, January 21, 2011|January 21, 2011]]) |
** Start Counter ([[GlueX Start Counter Meeting, December 2, 2010|December 2, 2010]]) | ** Start Counter ([[GlueX Start Counter Meeting, December 2, 2010|December 2, 2010]]) | ||
** Magnet | ** Magnet | ||
** Engineering | ** Engineering | ||
** Electronics | ** Electronics | ||
− | ** Offline Software ([[GlueX Offline Meeting, | + | ** Offline Software ([[GlueX Offline Meeting, January 12, 2011|January 12, 2011]]) |
− | ** Photon Beam and Tagger ([[BLTWG Meeting 01/10/2011| | + | ** Photon Beam and Tagger ([[BLTWG Meeting 01/10/2011|January 10, 2011]]) |
** Physics ([[December 6, 2010 (11AM), Physics Working Group|Minutes from December 6]]) | ** Physics ([[December 6, 2010 (11AM), Physics Working Group|Minutes from December 6]]) | ||
* AOT | * AOT |
Revision as of 12:08, 23 January 2011
Meeting Time and Place
The meeting will be on Wednesday January 26, 2011 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-800-377-8846 : US +1-888-276-7715 : Canada +1-302-709-8424 : International then enter participant code: 77438230# (remember the "#")
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Agenda
- Announcements
- Collaboration Meeting
- MOU and Contract Status
- Beamtests in 2011
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls ( 24-Nov-2010)
- Tracking ( Minutes from January 19)
- Calorimetry (Jan 20, 2011 Calorimetry); Readout (Minutes from January 13)
- TOF (January 21, 2011)
- Start Counter (December 2, 2010)
- Magnet
- Engineering
- Electronics
- Offline Software (January 12, 2011)
- Photon Beam and Tagger (January 10, 2011)
- Physics (Minutes from December 6)
- AOT