Difference between revisions of "GlueX TOF Meeting, January 21, 2011"
(→Agenda) |
(notes as minutes) |
||
Line 32: | Line 32: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | New Note 15 | ||
+ | |||
+ | fsu sasha | ||
+ | jlab mark, beni, hovanes, yi, sascha, simon | ||
+ | |||
+ | • check on crate | ||
+ | • different idea | ||
+ | ∘ go from 6 cm to 8 cm | ||
+ | ∘ beam hole bigger | ||
+ | ∘ double hit probability higher | ||
+ | ∘ running monte carlo to see effect | ||
+ | ∘ lose light with wider paddle, wider than PMT | ||
+ | ∘ fit tubes side by side, mu metal shield was causing interference | ||
+ | • exploring getting UV curing glue | ||
+ | ∘ JLab, groups, several K$ | ||
+ | ∘ Brian and Carl, Hall C group | ||
+ | • prototype taking data, not analyzed completely yet, some issues with current set-up | ||
+ | • | ||
+ | |||
+ | shipping pmt to jlab |
Revision as of 15:34, 21 January 2011
Contents
Location, Time
Friday, January 21, 2011
2:00 pm EST
JLab: CEBAF Center, Room F326/7
Agenda
- Announcements
- Meeting time ok?
- Minutes from the last meeting
- Prototype Status
- Contract status
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- direct meeting link
- Phone Bridge ID: 6 9368
Telephone
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ .
Minutes
New Note 15
fsu sasha jlab mark, beni, hovanes, yi, sascha, simon
• check on crate • different idea ∘ go from 6 cm to 8 cm ∘ beam hole bigger ∘ double hit probability higher ∘ running monte carlo to see effect ∘ lose light with wider paddle, wider than PMT ∘ fit tubes side by side, mu metal shield was causing interference • exploring getting UV curing glue ∘ JLab, groups, several K$ ∘ Brian and Carl, Hall C group • prototype taking data, not analyzed completely yet, some issues with current set-up •
shipping pmt to jlab