Difference between revisions of "Minutes-11-4-2010"
From GlueXWiki
Line 7: | Line 7: | ||
#* Frame lamination | #* Frame lamination | ||
# Electronics (Fernando, Chris, Roger) | # Electronics (Fernando, Chris, Roger) | ||
− | #* Update on PCBs | + | #* Update on PCBs [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination1.jpg delaminated PCB1] and [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination2.jpg PCB2] |
#* Cathode foil and rigid-flex procurement | #* Cathode foil and rigid-flex procurement | ||
#* Cathode foil inspection plan | #* Cathode foil inspection plan |
Revision as of 16:00, 4 November 2010
November 4, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- Frame lamination
- Electronics (Fernando, Chris, Roger)
- Update on PCBs delaminated PCB1 and PCB2
- Cathode foil and rigid-flex procurement
- Cathode foil inspection plan
- Engineering (Bill, David)
- Wire stringing status; position measurement system.
- Other
- Full-scale prototype tests
- status, timing with fADC125 (Beni)
- wire offset studies (Lubomir)
- Other