Difference between revisions of "Minutes-7-29-2010"
From GlueXWiki
Line 10: | Line 10: | ||
#* other updates: cable procurement, fADC | #* other updates: cable procurement, fADC | ||
# Engineering | # Engineering | ||
− | #* Cathode foil procurement (Roger)[http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup1.jpg UVA stuff] (38.25") | + | #* Cathode foil procurement (Roger) |
− | + | #* Wire stringing update (Bill); [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup1.jpg UVA stuff] (38.25") | |
#* Cathode frame prototyping | #* Cathode frame prototyping | ||
# Full-scale prototype tests | # Full-scale prototype tests |
Revision as of 16:18, 28 July 2010
July 29, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planing status 5 techs production schedule
- Electronics (Fernando)
- new PCB tests
- other updates: cable procurement, fADC
- Engineering
- Cathode foil procurement (Roger)
- Wire stringing update (Bill); UVA stuff (38.25")
- Cathode frame prototyping
- Full-scale prototype tests
- discussions about gas mixture and field configuration (Lubomir)
- cosmic test update (Beni) FDC Log Book, pages 505
- oxygen contamination measurements (Beni) Beni's scheme
- Other