Difference between revisions of "GlueX PID Meeting, July 9, 2010"
From GlueXWiki
(copy of last time) |
|||
Line 5: | Line 5: | ||
JLab: CEBAF Center, Room F326/7<br> | JLab: CEBAF Center, Room F326/7<br> | ||
ESNet: 8542553<br> | ESNet: 8542553<br> | ||
− | [http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link | + | [http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link]<ref>This link is good through 8/20</ref><br> |
Conference Group: 800-377-8846, participant code: 77438230<br> | Conference Group: 800-377-8846, participant code: 77438230<br> | ||
'''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-06</code> on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-06/ . | '''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-06</code> on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-06/ . | ||
Line 23: | Line 23: | ||
## Status of refrigerator plan | ## Status of refrigerator plan | ||
# [[Time-of-Flight/Start-Counter Action Items|Action Items]] | # [[Time-of-Flight/Start-Counter Action Items|Action Items]] | ||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Footnotes''' | ||
+ | <references/> |
Revision as of 11:00, 8 July 2010
Location, Time
Friday, July 9, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link[1]
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-06
on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-06/ .
Agenda
- Announcements
- Minutes from the last meeting
- Time-of-Flight
- Prototype progress
- Status of the MOU
- Start Counter
- prototype progress
- attenuation length measurements
- prototype progress
- Target
- Status of the MOU
- Status of refrigerator plan
- Action Items
Footnotes
- ↑ This link is good through 8/20