Difference between revisions of "Minutes-6-17-2010"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
#* 727 B.C. status | #* 727 B.C. status | ||
− | #* plans for wire stringing | + | #* plans for wire stringing [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table] |
# Electronics | # Electronics | ||
#* fADC125 status (Gerard, Fernando) | #* fADC125 status (Gerard, Fernando) |
Revision as of 11:44, 17 June 2010
June 17, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- plans for wire stringing pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- Electronics
- fADC125 status (Gerard, Fernando)
- Cathode redesign: finalizing, card grounding (Roger, Fernando)
- Full-scale prototype tests
- tests with fADC FDC Log Book, pages 486 - 489 (Lubomir)
- cosmic tests (Beni)
- Other