Difference between revisions of "GlueX PID Meeting, June 11, 2010"

From GlueXWiki
Jump to: navigation, search
(draft)
 
(complete draft)
Line 5: Line 5:
 
JLab: CEBAF Center, Room F326/7<br>
 
JLab: CEBAF Center, Room F326/7<br>
 
ESNet: 8542553<br>
 
ESNet: 8542553<br>
[http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link]<br>
+
[http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link (good through 8/20)]<br>
 
Conference Group: 800-377-8846, participant code: 77438230<br>
 
Conference Group: 800-377-8846, participant code: 77438230<br>
 
'''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-06</code> on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-06/ .
 
'''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-06</code> on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-06/ .
Line 12: Line 12:
  
 
# Announcements
 
# Announcements
# [[GlueX PID Meeting, April 30, 2010#Minutes|Minutes from the last meeting]]
+
# [[GlueX PID Meeting, May 28, 2010#Minutes|Minutes from the last meeting]]
 
# Time-of-Flight
 
# Time-of-Flight
## Calibration: variation of pulser amplitude for time walk correction measurement
 
## Change in thickness of TOF counters?
 
## Status of PMT purchase (for prototype testing)
 
## Electronics: signal split scheme (no dynode signal)
 
 
## Prototype progress
 
## Prototype progress
 
## Status of the MOU
 
## Status of the MOU
 
# Start Counter
 
# Start Counter
## prototype progress: attenuation length measurements
+
## prototype progress
 +
##* attenuation length measurements
 
# Target
 
# Target
 
## Status of the MOU
 
## Status of the MOU
 
## Status of refrigerator plan
 
## Status of refrigerator plan
 
# [[Time-of-Flight/Start-Counter Action Items|Action Items]]
 
# [[Time-of-Flight/Start-Counter Action Items|Action Items]]

Revision as of 12:16, 10 June 2010

Location, Time

Friday, June 11, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link (good through 8/20)
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-06 on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-06/ .

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Time-of-Flight
    1. Prototype progress
    2. Status of the MOU
  4. Start Counter
    1. prototype progress
      • attenuation length measurements
  5. Target
    1. Status of the MOU
    2. Status of refrigerator plan
  6. Action Items