Difference between revisions of "Minutes-6-10-2010"
From GlueXWiki
Line 13: | Line 13: | ||
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | ||
# Full-scale prototype tests | # Full-scale prototype tests | ||
− | #* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page | + | #* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 478 - 482] (Beni) |
#* new tests with fADC125 (Lubomir) | #* new tests with fADC125 (Lubomir) | ||
# Other | # Other |
Revision as of 10:39, 10 June 2010
June 10, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- wire stringing
- tension measurement system
- Electronics
- fADC125 status (Gerard, Fernando)
- noise/grounding investigations (Fernando)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype tests
- cosmics tests FDC Log Book, page 478 - 482 (Beni)
- new tests with fADC125 (Lubomir)
- Other