Difference between revisions of "Minutes-6-3-2010"
From GlueXWiki
Line 13: | Line 13: | ||
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | ||
# Full-scale prototype test results | # Full-scale prototype test results | ||
− | |||
− | |||
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 468] (Beni) | #* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 468] (Beni) | ||
+ | #* tests with fADC125: [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 467] (Lubomir) | ||
+ | #* Garfield simulations [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 466] (Simon) | ||
# Other | # Other | ||
Revision as of 16:20, 2 June 2010
June 3, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- new design one-layer prototype: PCB and cathode PRs, wire stringing fixtures
- Electronics
- fADC125 status (Fernando)
- PCB status (Kim, Fernando)
- CAEN HV noise investigations (Fernando)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype test results
- cosmics tests FDC Log Book, page 468 (Beni)
- tests with fADC125: FDC Log Book, page 467 (Lubomir)
- Garfield simulations FDC Log Book, page 466 (Simon)
- Other