Difference between revisions of "Minutes-5-27-2010"
From GlueXWiki
Line 8: | Line 8: | ||
#* new design one-layer prototype | #* new design one-layer prototype | ||
# Electronics | # Electronics | ||
− | #* fADC125 status (Fernando, Gerard) | + | #* fADC125 status (Fernando, Gerard) [http://www.jlab.org/Hall-D/detector/fdc/pictures/one_typ_event_nocorr.pdf raw fADC eevent], [http://www.jlab.org/Hall-D/detector/fdc/pictures/one_typ_event.pdf corrected] |
#* PCB status (Kim, Fernando) | #* PCB status (Kim, Fernando) | ||
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) |
Revision as of 13:13, 27 May 2010
May 27, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- new design one-layer prototype
- Electronics
- fADC125 status (Fernando, Gerard) raw fADC eevent, corrected
- PCB status (Kim, Fernando)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype test results
- tests with fADC125: FDC Log Book, pages 464 and 465 (Lubomir)
- cosmics tests FDC Log Book, pages 458 to 463 (Beni)
- Other