Difference between revisions of "Minutes-4-29-2010"
From GlueXWiki
Line 9: | Line 9: | ||
# Electronics | # Electronics | ||
#* PCB (Kim, Fernando) | #* PCB (Kim, Fernando) | ||
− | #* grounding/oscillation tests | + | #* grounding/oscillation tests (Lubomir) |
# Cathode redesign (Roger) | # Cathode redesign (Roger) | ||
# Cosmic tests (Beni) | # Cosmic tests (Beni) |
Revision as of 15:40, 28 April 2010
April 29, 2010 FDC meeting
Tentative Agenda
- Production space
- status
- off-site space planning
- Electronics
- PCB (Kim, Fernando)
- grounding/oscillation tests (Lubomir)
- Cathode redesign (Roger)
- Cosmic tests (Beni)
- results from the first tests
- plans
- Other
- talks at the Collaboration meeting