Difference between revisions of "April 22, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 21: Line 21:
  
 
# Announcements
 
# Announcements
#* First four Bcal modules have been shipped and crossed over into US territory! Expected arrival on Monday.
 
 
# Review of Action Items
 
# Review of Action Items
#* Elton will complete the loan request today
 
 
# Update - USM  
 
# Update - USM  
#* None
 
 
# Simulation runs (Gluex-doc-1474)
 
# Simulation runs (Gluex-doc-1474)
 
# Geometry
 
# Geometry
Line 36: Line 33:
  
 
# Announcements
 
# Announcements
 +
#* First four Bcal modules have been shipped and crossed over into US territory! Expected arrival on Monday.
 
# Review of Action Items
 
# Review of Action Items
 +
#* Elton will complete the loan request today
 
# Update - USM  
 
# Update - USM  
 +
#* None
 
# Simulation runs (Gluex-doc-1474)
 
# Simulation runs (Gluex-doc-1474)
 
# Geometry
 
# Geometry

Revision as of 17:28, 22 April 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
  2. Fill out loan agreement for SiPM arrays at UofR (Elton).
  3. Start a bulleted list of testing for the SiPMs (Serguey).
  4. Dynamic range of signals to sensor and electronics (Andrei).

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. Simulation runs (Gluex-doc-1474)
  5. Geometry
  6. SiPM Radiation Hardness Test (Yi)
  7. SiPM - Testing Schedules
  8. Light guides

Minutes

Attending:

  1. Announcements
    • First four Bcal modules have been shipped and crossed over into US territory! Expected arrival on Monday.
  2. Review of Action Items
    • Elton will complete the loan request today
  3. Update - USM
    • None
  4. Simulation runs (Gluex-doc-1474)
  5. Geometry
  6. SiPM Radiation Hardness Test (Yi)
  7. SiPM - Testing Schedules
  8. Light guides