Difference between revisions of "Minutes-4-22-2010"
From GlueXWiki
Line 9: | Line 9: | ||
# Updates on: | # Updates on: | ||
#* Electronics: PCB, cable procurement status (Fernando) | #* Electronics: PCB, cable procurement status (Fernando) | ||
− | #* Cathode redesign ( | + | #* Cathode redesign (Roger) |
− | #* FDC [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill) | + | #* FDC [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling] (Bill) |
# Full-scale prototype | # Full-scale prototype | ||
#* status (Lubomir) | #* status (Lubomir) |
Revision as of 20:27, 21 April 2010
April 22, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian): pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Roger)
- FDC cabling (Bill)
- Full-scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other