Difference between revisions of "Minutes-4-15-2010"
From GlueXWiki
Line 6: | Line 6: | ||
# Production | # Production | ||
#* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan] | #* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan] | ||
− | #* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian) | + | #* Wire winding options: IUCF, JLab using [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/Chan_thesis_p29_38.pdf UVA equipment], or using SSC winding machine (Lubomir, Bill, Brian) |
# Updates on: | # Updates on: | ||
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim) | #* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim) |
Revision as of 10:13, 15 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian)
- Updates on:
- Electronics: finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right (Fernando, Kim)
- Cathode redesign (Bill, Roger)
- Tests of the new frame prototype (Lubomir)
- Full scale prototype
- Three-layer HV tests (Beni)
- Preparations for cosmics tests
- Other