Difference between revisions of "Minutes-4-15-2010"
From GlueXWiki
Line 6: | Line 6: | ||
# Production | # Production | ||
#* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan] | #* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan] | ||
− | #* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine | + | #* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian) |
− | # Updates on | + | # Updates on: |
− | #* finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] | + | #* electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim) |
− | #* Cathode redesign | + | #* Cathode redesign (Bill, Roger) |
− | #* results from the tests of the new frame prototype | + | #* results from the tests of the new frame prototype (Lubomir) |
# Full scale prototype | # Full scale prototype | ||
#* three-layer HV tests (Beni) | #* three-layer HV tests (Beni) | ||
− | #* | + | #* preparations for cosmics tests |
# Other | # Other | ||
Revision as of 17:58, 14 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian)
- Updates on:
- electronics: finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right (Fernando, Kim)
- Cathode redesign (Bill, Roger)
- results from the tests of the new frame prototype (Lubomir)
- Full scale prototype
- three-layer HV tests (Beni)
- preparations for cosmics tests
- Other