Difference between revisions of "Minutes-4-15-2010"
From GlueXWiki
Line 8: | Line 8: | ||
#* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine? | #* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine? | ||
# Updates on the redesigns | # Updates on the redesigns | ||
− | #* finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf | + | #* finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] |
− | Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] | + | |
#* Cathode redesign | #* Cathode redesign | ||
#* results from the tests of the new frame prototype | #* results from the tests of the new frame prototype |
Revision as of 17:55, 14 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
- Updates on the redesigns
- finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right
- Cathode redesign
- results from the tests of the new frame prototype
- Full scale prototype
- three-layer HV tests (Beni)
- preparation for cosmics tests
- Other