Difference between revisions of "Minutes-4-8-2010"
From GlueXWiki
Line 8: | Line 8: | ||
#* requirements, floor plan | #* requirements, floor plan | ||
# Electronics (Fernando) | # Electronics (Fernando) | ||
− | #* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] | + | #* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] |
#* cable procurement | #* cable procurement | ||
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/cathode_foil_redesign.pdf redesign], [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign.pdf central hole] (Bill, Roger) | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/cathode_foil_redesign.pdf redesign], [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign.pdf central hole] (Bill, Roger) |
Revision as of 10:42, 8 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Off-site production space
- status
- requirements, floor plan
- Electronics (Fernando)
- finalizing PCB design Readout_right Readout_left HV_right HV_left
- cable procurement
- Cathode redesign redesign, central hole (Bill, Roger)
- Redesigned frame prototype
- plans for tests
- Full scale prototype (Beni)
- two-layer HV tests
- third layer status
- preparation for cosmics tests
- Other