Difference between revisions of "SiPM Radiation Hardness Test"
From GlueXWiki
(→2010 Apr 1) |
(→2010 Apr 1) |
||
Line 165: | Line 165: | ||
[[Image:sipm_cc_v4.png|thumb|left|500px|The V4 Labview control VI with EPICS variables.]] | [[Image:sipm_cc_v4.png|thumb|left|500px|The V4 Labview control VI with EPICS variables.]] | ||
<br clear=all> | <br clear=all> | ||
+ | |||
+ | === 2010 Apr 5 === | ||
+ | |||
+ | * Updated Control VI to v5, new features added | ||
+ | ** independent readouts from GPIB, Serial and EPICS | ||
+ | ** added communication status indications | ||
+ | ** added plot history feature | ||
== Data Analysis == | == Data Analysis == |
Revision as of 11:15, 6 April 2010
SiPM Radiation Hardness Test in Hall A
Contents
Test Plan
The Draft Test Plan to Study Radiation Damage to SiPMs in Hall A
System Diagram
Device List
- Control Computer: transversity.jlab.org: (129.57.164.28)
- GPIB over IP: GPIB-ENET/100: agpib.jlab.org (129.57.192.73)
- Serial Port Server: ESP904: portservha50.jlab.org (129.57.192.78)
- USB over IP: AnywhereUSB/5: ausb.jlab.org (129.57.192.75)
- Oscilliscope: TDS3034: dosci.jlab.org (129.57.192.77)
- Power Outlet: APC Outlet Control: hlauser:hlauser@hareboot12.jlab.org (129.57.192.76)
- Outlet 1: Pulse Generator
- Outlet 2: Temperature Box
- Outlet 3: Oscilliscope
- Outlet 4: GPIB over IP
- Outlet 5: Power Supply for Hamamatsu Unit
- Outlet 6: Power Supply for SensL Unit
- Outlet 7: Picoamp Meter
- Outlet 8: Serial Port Server
- USB to Serial HUB: ComHUB
- Serial 1 (COM5): Power Supply for Hamamatsu Unit
- Serial 2 (COM6): Power Supply for SensL Unit
- Serial 3 (COM7): Oscilliscope
- Serial 4 (COM8): Temperature Box
- Picoamp Meter x2: Keithley-485 (GPIB)
- GPIB Address: 1 (Hamamatsu); 2 (SensL)
- Pulse Generator: HP-8116A (GPIB)
- GPIB Address: 4
- Power Supply x2: B&K-1787B (RS232)
- Temperature Meter: CN77544 (RS232)
Power Connection and Settings
- Power Cable Color Code
- Black: Ground
- Yellow: -5.0 V
- Red: +2.1 V
- Blue: Hamamatsu Bias Voltage
- Green: SensL Bias Voltage
- SiPM Bias Voltage Correction vs Temperature
- Hamamatsu: 56 mV/C (70.27 at 20 C)
- SensL: 23 mV/C (28.6 at 20 C)
EPICS Variables
Hall A Beam Line IOC: iocha5.jlab.org [129.57.188.5]
- hac_bcm_average: Hall A beam current (uA)
Hall A Cryo Target IOC: iocha13.jlab.org [129.57.188.29]
- haBDSPOS.VAL: Hall A cryo target position (encoder value)
MCC general IOC: 129.57.255.4
- rad44_p2: Neutron dose [mRem/hour]
- rad44_p2_dose: Accumulated Neutron dose [mRem]
- rad44_p1: Gamma dose [mRem/hour]
- rad44_p1_dose: Accumulated Gamma dose [mRem]
Event Log
2010 Mar 17
- Photos of SiPM test setup.
- All Hardware intrustruments have been connected.
- The SiPM box is put on top of the cryo target parking support which is at about 135 degrees to the left side of the beam and 20 meters away from the target.
- The real time neutron counter is put right next to the SiPM.
2010 Mar 18
- Have all the remote communication working properly.
- Other than the oscilloscope, Labview programs to all the rest devices are ready.
- Did first measurement of the correlation between the draw current and the bias voltage.
- Signals on Oscilloscope with 70.5V on Hamamatsu and 28.5V on SensL are shown as well.
2010 Mar 19
- Finished Oscilloscope initialization program, the readback program is done as well but not quite stable
- Increase the pulse frequency to 1.0 kHz, here is the final configuration for the pulse generator
* Direct DC couple to the LED * Frequency: 1.0 kHz * Width: 8.0 ns * High Level: 5.0 V * Low Level: 0.0 V
- Tested the draw current corresponding to the voltage level and recorded the oscilloscope signals (average of 128 waveforms)
- Removed both SiPMs from the box for Hall closing.
- SiPM signal shape vs bias voltage
- Draw current vs bias voltage
- SiPM signal amplitude vs draw current as a function of bias voltage. From the plots, we can have some sense of the signal to background ratio.
2010 Mar 21
- Finished first version of the Central Control VI, change all serial communication timeout to be 1 second
- Stress test
2010 Mar 22
- Stress test failed, system won't run VI after rebooting. Maybe it's time to rebuilt the XP system on the computer
2010 Mar 23
- Brought transversity.jlab.org to CC for a system rebuilt
- At the mean time, upgraded the Central Control VI to version 2 with a more responsive interface and better timing control.
2010 Mar 24
- CC rebuilt the XP System
- Installed all necessary software, all devices are up and running well
- Changed GPIB timeout to be 1 second, should not have any timeout problem
- Stress test with Central Control VI without writing file to the disk :S
2010 Mar 25
- Modified the algorithm to initialize the VISA resource.
- New stress test passed 30000 readings!!!!
2010 Mar 26
- AGPIB and DOSCI lost connection at around 12:30AM when MCC tuning beam in the Hall. Rebooting solved the problem. More shielding may be required.
2010 Mar 29
- Added additional shielding in front of the instruments
2010 Mar 31
- EPICS readout configured
2010 Apr 1
- Updated Control VI to v4 with intregrated EPICS readout
2010 Apr 5
- Updated Control VI to v5, new features added
- independent readouts from GPIB, Serial and EPICS
- added communication status indications
- added plot history feature
Data Analysis
Data History
- 20100318 Pulse Frequency: 500 Hz
- 20100319 Pulse Frequency: 1.0 kHz