Difference between revisions of "Minutes-3-25-2010"
From GlueXWiki
Line 6: | Line 6: | ||
# Production space update [http://www.jlab.org/Hall-D/detector/fdc/general/ off-site floor plans] | # Production space update [http://www.jlab.org/Hall-D/detector/fdc/general/ off-site floor plans] | ||
# Electronics | # Electronics | ||
− | #* threshold variations in the discriminator section of the pre-amps (Fernando) | + | #* threshold variations in the discriminator section of the pre-amps (Fernando) [http://www.jlab.org/Hall-D/detector/fdc/electronics/GPC-IITestsDiscriminator.pdf Fernando's pdf] |
#* PCB status | #* PCB status | ||
− | # Frame modification | + | # Frame modification |
#* cathode sandwich and wire frame | #* cathode sandwich and wire frame | ||
#* ground plane tests (leakage, tension) | #* ground plane tests (leakage, tension) |
Revision as of 13:25, 25 March 2010
March 25, 2010 FDC meeting
Tentative Agenda
- Production space update off-site floor plans
- Electronics
- threshold variations in the discriminator section of the pre-amps (Fernando) Fernando's pdf
- PCB status
- Frame modification
- cathode sandwich and wire frame
- ground plane tests (leakage, tension)
- Wire winding update
- IUCF phase 3 contract phase 3 budget
- plans for wire winding upgrades in the summer
- tension specs
- Full scale prototype tests
- lessons learned from the HV tests cope-shots1, cope-shots2, HV issues
- plans for tests in the tend
- some results from the tests with Sr source FDC Log Book (Lubomir)
- Cathode frame redesign
- MC studies of the beam hole size (Alex)
- Other
- wire sample measurements wire sample reports
- updated FDC naming convention naming convention