Line 12: | Line 12: | ||
#* ground plane tests (leakage, tension) | #* ground plane tests (leakage, tension) | ||
# Wire winding update | # Wire winding update | ||
− | #* IUCF phase 3 contract | + | #* IUCF phase 3 contract [http://www.jlab.org/Hall-D/detector/fdc/documents/budget_phase_3_3-24-10.pdf phase 3 budget] |
#* plans for wire winding upgrades in the summer | #* plans for wire winding upgrades in the summer | ||
#* tension specs | #* tension specs |
Revision as of 11:24, 25 March 2010
March 25, 2010 FDC meeting
Tentative Agenda
- Production space update off-site floor plans
- Electronics
- threshold variations in the discriminator section of the pre-amps (Fernando)
- PCB status
- Frame modification work
- cathode sandwich and wire frame
- ground plane tests (leakage, tension)
- Wire winding update
- IUCF phase 3 contract phase 3 budget
- plans for wire winding upgrades in the summer
- tension specs
- Full scale prototype tests
- lessons learned from the HV tests cope-shots1, cope-shots2
- plans for tests in the tend
- some results from the tests with Sr source FDC Log Book (Lubomir)
- Cathode frame redesign
- MC studies of the beam hole size (Alex)
- Other
- wire sample measurements wire sample reports
- updated FDC naming convention naming convention