Difference between revisions of "Feb 11, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Items for followup from previous meeting)
Line 15: Line 15:
 
# Detailed task list of everything that needs to be accomplished to flush out the use of SiPMs. (Elton, Fernando, Carl, Eugene...)
 
# Detailed task list of everything that needs to be accomplished to flush out the use of SiPMs. (Elton, Fernando, Carl, Eugene...)
 
# First results of SiPM testing at USM (Serguei)
 
# First results of SiPM testing at USM (Serguei)
 +
# Input/Decisions needed to finalize Bcal readout requirements
 +
#* Specify the normalization and dynamic range for the number of photons/GeV in showers
 +
#* Decide on specific grouping for SiPM sums
 +
#* Possibility of using air gap for SiPM coupling
 +
#* Finalize shapes of "Winston guides"
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 14:33, 10 February 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Testing of new cal modules to measure light output and determine the range of phoelectrons expected.
  2. Sensitivity to Hadronic radiation: Stepan to provide information on damage to SiPMs during NH3 pol target run. (Stepan)
  3. Detailed task list of everything that needs to be accomplished to flush out the use of SiPMs. (Elton, Fernando, Carl, Eugene...)
  4. First results of SiPM testing at USM (Serguei)
  5. Input/Decisions needed to finalize Bcal readout requirements
    • Specify the normalization and dynamic range for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Possibility of using air gap for SiPM coupling
    • Finalize shapes of "Winston guides"

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. SiPM - update
  5. Light guides
  6. Geometry
  7. Discussion - MOU with USM

Minutes

Attending: