Difference between revisions of "Solenoid Coil Test in Test Lab"
From GlueXWiki
m |
m |
||
Line 19: | Line 19: | ||
** Determine location of all components - Wayne | ** Determine location of all components - Wayne | ||
** Arrange for piping designer - George | ** Arrange for piping designer - George | ||
+ | *** Design piping to vent N2. | ||
+ | *** Design warm and cold He supply/return systems, LN2 supply system. | ||
** Investigate sensitivity of electronic equipment to B fields - Elliott | ** Investigate sensitivity of electronic equipment to B fields - Elliott | ||
− | |||
− | |||
Line 47: | Line 47: | ||
* Notes: | * Notes: | ||
+ | ** Will instrument controls racks in F117, then move to Test Lab. | ||
+ | ** Will instrument for final 4-coil system. | ||
* To Do: | * To Do: | ||
+ | ** Rearrange F117 - Mark S and Beni | ||
+ | ** Get and move 3 racks into F117 - Mark S | ||
Revision as of 14:00, 18 June 2009
Notes and to-do lists for the solenoid coil tests this summer and fall.
Test Area
- Notes:
- Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts.
- May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas).
- May need extra space for large power supply (6' x 5') and to avoid placing controls racks in large B field.
- Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways.
- Platform is 172" x 160", cryo can will sit on top.
- Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons).
- Need come-alongs and anchors to move yokes and coils along rails.
- To Do:
- Look into getting space in adjacent areas - George
- Look into possibility of locating computer in control room - Elliott
- Distribute Floyd's B field map for single coil, no cladding - George
- Determine location of all components - Wayne
- Arrange for piping designer - George
- Design piping to vent N2.
- Design warm and cold He supply/return systems, LN2 supply system.
- Investigate sensitivity of electronic equipment to B fields - Elliott
- Verify we have all cryo transfer lines and U-tubes - Mark S
- Verify we can borrow heat exchanger from Hall A - George
- Order warm He and N2 piping - ?
- Retrieve rails from IU - ?
Infrastructure
- Notes:
- To Do:
Components
- Notes:
- To Do:
Staging
- Notes:
- Will instrument controls racks in F117, then move to Test Lab.
- Will instrument for final 4-coil system.
- To Do:
- Rearrange F117 - Mark S and Beni
- Get and move 3 racks into F117 - Mark S
Reviews
- Notes:
- Micro-review of PLC vendor choice completed, waiting for report.
- To Do:
- Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review.