Line 9: | Line 9: | ||
** Need space for large power supply (6' x 5') and to avoid placing controls racks in large B field. | ** Need space for large power supply (6' x 5') and to avoid placing controls racks in large B field. | ||
** Must maintain clear areas around racks, power supply and cannot block pedestrian areas. | ** Must maintain clear areas around racks, power supply and cannot block pedestrian areas. | ||
+ | ** Platform is 172" x 160". | ||
+ | ** Need to design piping to vent N2. | ||
+ | ** Need to design piping for warm and cold He, LN2. | ||
* To Do: | * To Do: | ||
** Look into getting space in adjacent areas - George | ** Look into getting space in adjacent areas - George | ||
** Look into possibility of locating computer in control room - Elliott | ** Look into possibility of locating computer in control room - Elliott | ||
+ | ** Distribute Floyd's B field map for single coil, no cladding - George | ||
+ | ** Determine location of all components - Wayne | ||
+ | ** Arrange for piping designer - George | ||
+ | |||
Revision as of 13:46, 18 June 2009
Notes and to-do lists for the solenoid coil tests this summer and fall.
Test Area
- Notes:
- Area is in the test lab, footprint 20'6" x 25'9", currently filled with coils and coil parts.
- May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas).
- Need space for large power supply (6' x 5') and to avoid placing controls racks in large B field.
- Must maintain clear areas around racks, power supply and cannot block pedestrian areas.
- Platform is 172" x 160".
- Need to design piping to vent N2.
- Need to design piping for warm and cold He, LN2.
- To Do:
- Look into getting space in adjacent areas - George
- Look into possibility of locating computer in control room - Elliott
- Distribute Floyd's B field map for single coil, no cladding - George
- Determine location of all components - Wayne
- Arrange for piping designer - George
Infrastructure
- Notes:
- To Do:
Components
- Notes:
- To Do:
Staging
- Notes:
- To Do:
Reviews
- Notes:
- To Do: