Difference between revisions of "JEF meeting, April 25, 2025"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 13: | Line 13: | ||
** Initial HV settings using Compton scattering events [https://logbooks.jlab.org/entry/4357131] | ** Initial HV settings using Compton scattering events [https://logbooks.jlab.org/entry/4357131] | ||
** Pi0 calibration page [https://halldweb.jlab.org/wiki/index.php/ECAL_Calibration] | ** Pi0 calibration page [https://halldweb.jlab.org/wiki/index.php/ECAL_Calibration] | ||
− | *** | + | *** Pi0s are clearly seen for most ECAL modules (except in the innermost ring) |
* Monitoring | * Monitoring | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
** The prototype has been assembled and tested. Ready for installing in Hall D | ** The prototype has been assembled and tested. Ready for installing in Hall D | ||
*** Move it to the Hall on Wednesday next week (?) | *** Move it to the Hall on Wednesday next week (?) |
Revision as of 09:04, 25 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- HV module disconnected from the EPICS control
- Bad flash ADC for reference PMTs
- Low-level histograms [1]
- Adjusting high voltages [2] (based on the run period 10, iteration 0)
- Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [3]. Suspicious modules after the accelerator maintenance day
- Calibrations
- Monitoring
- Restoring PS test setup [6]
- The prototype has been assembled and tested. Ready for installing in Hall D
- Move it to the Hall on Wednesday next week (?)
- The prototype has been assembled and tested. Ready for installing in Hall D