Difference between revisions of "JEF meeting, April 25, 2025"
From GlueXWiki
(→Agenda) |
|||
Line 11: | Line 11: | ||
** Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day | ** Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day | ||
* Calibrations | * Calibrations | ||
− | ** Initial | + | ** Initial HV settings using Compton scattering events [https://logbooks.jlab.org/entry/4357131] |
** Pi0 calibration page [https://halldweb.jlab.org/wiki/index.php/ECAL_Calibration] | ** Pi0 calibration page [https://halldweb.jlab.org/wiki/index.php/ECAL_Calibration] | ||
+ | *** | ||
* Monitoring | * Monitoring | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
** The prototype has been assembled and tested. Ready for installing in Hall D | ** The prototype has been assembled and tested. Ready for installing in Hall D | ||
*** Move it to the Hall on Wednesday next week (?) | *** Move it to the Hall on Wednesday next week (?) |
Revision as of 09:00, 25 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- Calibrations
- Monitoring
- Restoring PS test setup [6]
- The prototype has been assembled and tested. Ready for installing in Hall D
- Move it to the Hall on Wednesday next week (?)
- The prototype has been assembled and tested. Ready for installing in Hall D