Difference between revisions of "JEF meeting, April 25, 2025"
From GlueXWiki
Line 14: | Line 14: | ||
* Monitoring | * Monitoring | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
+ | ** The prototype has been assembled and tested. Ready for installing in Hall D | ||
+ | *** Move it to the Hall on Wednesday next week (?) |
Revision as of 08:53, 25 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- Calibrations
- Initial setting of HVs using Compton scattering events
- Pi0 calibration page [3]
- Monitoring
- Restoring PS test setup [4]
- The prototype has been assembled and tested. Ready for installing in Hall D
- Move it to the Hall on Wednesday next week (?)
- The prototype has been assembled and tested. Ready for installing in Hall D