Difference between revisions of "JEF meeting, April 25, 2025"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
 
* Monitoring
 
* Monitoring
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 +
** The prototype has been assembled and tested. Ready for installing in Hall D
 +
*** Move it to the Hall on Wednesday next week (?)

Revision as of 08:53, 25 April 2025

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • HV module disconnected from the EPICS control
    • Bad flash ADC for reference PMTs
    • Low-level histograms [1]
    • Adjusting high voltages [2]
  • Calibrations
    • Initial setting of HVs using Compton scattering events
    • Pi0 calibration page [3]
  • Monitoring
  • Restoring PS test setup [4]
    • The prototype has been assembled and tested. Ready for installing in Hall D
      • Move it to the Hall on Wednesday next week (?)