Difference between revisions of "JEF meeting, April 18, 2025"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...") |
|||
Line 2: | Line 2: | ||
*9:30 am EST (JLab time) remote only | *9:30 am EST (JLab time) remote only | ||
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | ||
− | |||
− | |||
* ECAL maintenance and performance during the run | * ECAL maintenance and performance during the run | ||
+ | ** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038] | ||
+ | ** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255] | ||
+ | ** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422] | ||
+ | *** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367] | ||
+ | ** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528] [https://logbooks.jlab.org/entry/4350730] | ||
+ | ** Issues with the readout crate during two first two production nights [https://logbooks.jlab.org/entry/4352046] | ||
* Calibrations | * Calibrations | ||
− | * Restoring PS test setup | + | ** First look at Compton scattering events in the ECAL [https://logbooks.jlab.org/entry/4352034] |
+ | ** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ||
+ | ** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf] | ||
+ | * Monitoring | ||
+ | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
+ | ** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] |
Revision as of 09:28, 18 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- ECAL maintenance and performance during the run
- Issue with the FCAL HV module [1]
- Flash ADC scalers during first beam [2]
- Two modules fixed during the accelerator maintenance day [3]
- ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
- Commissioning of the ECAL trigger [5] [6]
- Issues with the readout crate during two first two production nights [7]
- Calibrations
- Monitoring
- Restoring PS test setup [11]
- Assembling PS prototype [12]