Difference between revisions of "JEF meeting, April 11, 2025"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 19: Line 19:
 
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404]
 
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404]
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 +
** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup]

Revision as of 11:32, 10 April 2025

Connection

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • Issue with the FCAL HV module [1]
    • Flash ADC scalers during first beam [2]
    • Two modules fixed during the accelerator maintenance day [3]
      • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
    • Commissioning of the ECAL trigger [5] [6]
    • Issues with the readout crate during two first two production nights [7]
  • Calibrations
    • First look at Compton scattering events in the ECAL [8]
  • Monitoring
    • ECAL/FCAL energy and timing [9]
  • Restoring PS test setup [10]
    • Assembling PS prototype [11]