Difference between revisions of "JEF meeting, April 11, 2025"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 19: | Line 19: | ||
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
+ | ** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] |
Revision as of 11:32, 10 April 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- Issue with the FCAL HV module [1]
- Flash ADC scalers during first beam [2]
- Two modules fixed during the accelerator maintenance day [3]
- ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
- Commissioning of the ECAL trigger [5] [6]
- Issues with the readout crate during two first two production nights [7]
- Calibrations
- First look at Compton scattering events in the ECAL [8]
- Monitoring
- ECAL/FCAL energy and timing [9]
- Restoring PS test setup [10]
- Assembling PS prototype [11]